MSC: HVAC Building Commissioning
MSC's specialized HVAC building commissioning process identifies and addresses equipment and operational problems before they affect building operation and negatively impact occupant health, welfare and comfort.
MSC provides substantial verification of systems and equipment installed and ensures that building systems perform in accordance with contract documents and design intent.
Independent commissioning
MSC's independent commissioning is complementary to the construction period services performed by the architects and mechanical engineer of record and to the testing and balancing requirements of the construction contract.Adherence to drawings and specifications
The system installation and operation are verified against the construction documents and owner's requirements. Discrepancies are identified and documented for correction by the involved parties.
In new construction, the building commissioning process is implemented to ensure that equipment and systems perform as intended, and it is generally accepted that commissioning is most effective when applied as early in the construction process as possible to have maximum impact.